The following information present the projects from the company director's previous professional experience. These projects were undertaken prior to the establishment of Boygle Works Ltd and are included to demonstrate relevant technical experience and engineering capability.
The company's director's previous professional experience has supported and contributed to over 150 marine engineering projects across the UK, spanning both coastal and inland locations. This has provided experience across a variety of marine engineering specialties.
Drawing on this breadth of experience, Boygle brings a broad and adaptable skillset to each project, allowing us to approach a wide range of marine engineering challenges with practical, tailored solutions.
Below are 10 notable works from previous professional experience that display the skillset available at Boygle.
Supporting work for the marine piling during the extension of a major deep-water container terminal:
Stability verification of a crawler crane atop of a flattop barge to find the working limits of the barge and crane configuration to ensure the barge remains stable at all times in a dynamic operating environment.
Retrofitting and stability verification of a pile delivery barge. Including design of pile trestles with appropriate sea fastening to enable the secure transportation of piles to site. Design of a pivoting pile pitching structure that enabled the piles to be safely and efficiently pitched from horizontal to vertical on site.
Design of a temporary crew access pier to enable the safe access and egress of boat crews to the working barges. Included design of a concrete bankseat, monopile, pontoon pile guides and the modification of a tower crane jib to act as a brow to reduce costs.
Design of a bubble curtain system creating a continuous cloud of air bubbles around the pile during driving, reducing the transmission of underwater pressure waves and minimising disturbance to marine life.
Design work for the replacement of a life expired dredger berth on the Medway, specifically the design of the following:
Reinforced concrete capping beam and retaining wall to top off the new sheet pile wall.
Steel berthing frames welded to the face of the sheet pile wall to enable the safe routine berthing of large dredging vessels.
Anchor design of the bollards to ensure load transfer of line loads into the berthing face.
Intergrated safety ladder to allow emergency egress out of the water in accordance with British Standards.
Supporting work for the installation of a new steel footbridge by river:
Modifications and structural verification of existing temporary works, that facilitated the removal of the damaged timber bridge, to support the assembly of a new heavier steel bridge.
Stability verification of the floating unit during various states of bridge assembly and during transport to ensure the unit was stable at all time during operation.
Planning and sequencing for the maritime works to enable successful delivery of the project in a geographically constrained location.
Design work for the insitu replacement of seized roller bearings on the pontoon end of a brow:
Permanent works design for the replacement roller bearings ensuring that the bearing will operate for a long life in a harsh environment.
Design of temporary works to enable the bearings and brow end to be replaced and refurbished insitu.
Planning and sequencing for the maritime works to enable successful delivery of the project.
Full design support through the Transport for London (TfL) Technical Approval Authority's (TAA's) process.
A combination of design and design verification of the access brow for the SS Robin Pontoon:
Design of a cantilever steel and concrete bankseat to support the access brow, including tying the new structure into the existing concrete quayside using cast-in anchors.
Structural assessment of the design of the access brow and the cantilever landing platform on the pontoon.
Design work for the installation of a nautical themed canopy for a floating pier to create additional outdoor luxury event space:
Structural assessment of the fabric canopy to ensure the large canopy does not rip, stretch or tear under environmental loading.
Design of the steel structure supporting the fabric canopy in the style of a set of yacht masts.
Design of a winch and pulley system to allow the fabric portion of the canopy to be raised and lowered using nautical equipment.
Supporting work for the drydocking of a salvaged ship that had sunk on its mooring.
Planning scheme for the successful tidal drydocking of the severely corroded salvaged ship.
Design of modifications to the drydock to ensure the vessel sat in the drydock correctly, which included bespoke stands and an extension to the drydock so the ship would fit inside.
Supporting work for temporarily converting a barge into a spud barge and then converting it again into a permanently moored pontoon including the design of the following:
Spud wells that were welded onto the original barge.
Structural verification of the existing mooring risers and brow at the permanent location.
Mooring guides to work with the existing mooring risers with suitable dampening to reduce the impact on the existing mooring risers.
Supporting work for the construction of a new houseboat on the Thames with a modular hull, enabling the hull to be exchanged for repair and maintenance as required.
Design of a bespoke modular hull and grillage frame that connect the hull units together and to the house structure above.
Stability verification of the houseboat and its structure to determine the maximum achievable height while ensuring adequate stability and safety for habitation
Supporting work for the construction of a floating bridge made up of modular pontoons spanning across a lake at Kew Gardens.
Stability verification of the pontoon bridge, ensuring it remains stable and buoyant whilst being fully loaded with people.
Design of the walkway ensuring that the pedestrian load is distributed from the walkway into the many plastic modular pontoons below the deck.
Design of the sinker system that restrains the pontoon bridge from moving on the lake.